Johnson/Chronister Residence

Johnson/Chronister Residence
1354 The High Road
C.O.A. Rating:

Master Bedroom Photos

These are photos of the Master Bedroom during construction.

  1. The foundation finished, formwork being stripped, and the ICF's being delivered for installation.
  2. The Perform Wall Insulated Concrete Forms (ICF's) installed.
  3. The roof and walls being dried in.
  4. The installation of the Texas Moss Rock and Cedar Posts harvested from the lot.
  5. A Night Photo by James Bruce with the landscaping completed.