Courtyard Photos
These are photos of the side courtyard during construction.
- Installation of the Perform Wall Insulated Concrete Forms (ICF's).
- The beganning of the framing of the Great Room and Stair Tower.
- The roof and walls being dried in.
- The stucco and "weeping mortar" chicago brick installed.
- The metal roof of the great room and composition roof on the adjacent roofs.
- The completion of the base of the tower utilizing drystacked Texas Moss Rock.